Unfortunately, the listing you're looking for is no longer available.
Similar Listings
Notice to Establish a Branch Office
Notification is given that MidFirst Bank, 501 NW Grand Boulevard, Oklahoma City, Oklahoma 73118, publishes notice under 12 CFR 5.8 of its intent to establish a branch office at 255 California Street, Suite 725, San Francisco, CA 94111, for the purpose of traditional deposit and lending activities. Within 30 days of the date of this publication, any person wishing to comment on this application may file comments in writing with the Director for District Licensing, Office of the Comptroller of the Currency, 500 North Akard Street, Suite 1600, Dallas, Texas 75201 or to the Office of the Comptroller of the Currency website at SO.Licensing@occ.treas.gov and to Charles Lee, MidFirst Bank, 501 NW Grand Boulevard, Oklahoma City, OK 73118. Show more »
City and County of San Francisco / DB-140 – Southeast Water Pollution Control Plant – Secondary Clarifiers Rehabilitation
PCL Construction, Inc. is soliciting Certified LBE/DBE/MBE/WBE/SBE/DVBE/OBE/ Subs & Suppliers to bid the DB 140 – Southeast Water Pollution Control Plant – Secondary Clarifiers Rehabilitation in San Francisco, CA for the City and County of San Francisco. Bids are due July 21, 2026 @ 2:00PM (PT). Project Description: The project is the phased refurbishment of eight secondary clarifiers. Main scopes of work are the removal of existing rotating clarifier mechanisms, followed by supply and installation of new equipment. During equipment replacement contractor will perform inspection of existing clarifier concrete conditions, with repair of surface and cracking defects as needed followed by a coating of interior clarifier tank walls and launders. Electric scope for control and instrumentation of replacement equipment will be included with new site lighting and flatwork repair replacement. PCL intends to break up the requirements into smaller portions to encourage maximum participation, arrange time frames for contracts and establish delivery schedules, where the requirements permit, in a way that encourages and facilitates participation of DBEs. Payment & Performance Bonds may be required & bonding assistance is available. Subcontractors and Suppliers are encouraged to contact PCL for insurance requirements, equipment & materials, or if any other assistance is needed. PCL celebrates diversity and is proud to be equal opportunity employer. For further assistance & to request plans contact Andrea Chavez at 480-763-2743 or via email at andreachavez@pcl.com. CWSRF & WIFIA funding requirements apply. This includes but not limited to: AIS, BABA, Davis-Bacon/Prevailing wages, Equal Employment Opportunity (EEO), Civil Rights Obligations, PLA Local Area Apprenticeship, Fair Share Objectives, DIR Registration & CA License. NAICS: 237110, 238110, 238210, 238320, 238390, 238910, 238990, 332999. Scopes needed: demolition, asphalt / concrete paving and flatwork, concrete repair / rehabilitation, joints / caulking / crack repair, structural and misc. metal supply, coatings, electrical / lighting / instrumentation, process piping, and process equipment supply. Show more »
Cellco Partnership and its controlled affiliates doing business as Verizon Wireless (Verizon Wireless) is proposing to collocate antennas at a top height of 33-ft on a 59-ft Building located at Pier 28, San Francisco, San Francisco County, California 94105. Public comments regarding potential effects from this site on historic properties may be submitted within 30 days from the date of this publication to: Project 260067096PR, EBI Consulting, 21 B Street, Burlington, MA 01803, EBIPNReplies@ebiconsulting.com or at (617) 715-1822. Show more »