NOTICE TO ENGINEERING DESIGN CONSULTANTS The Sewer Authority Mid-Coastside (the "Authority"), San Mateo County, California is issuing a Request for Proposals (RFP) and will receive Proposals from Engineering Design Consultants for its WWTP ELECTRICAL SYSTEM RELOCATION PROJECT. A mandatory Pre-Proposal Conference and Site Visit is being conducted at the Wastewater Treatment Plant at 1000 North Cabrillo Highway in Half Moon Bay on March 20, 2025 at 10 AM. Attendance at the Pre-Proposal Conference and Site Visit is required. Proposals will not be accepted by the Authority from proposers that fail to attend the Mandatory Pre-Proposal Conference and Site Visit. Proposals will be received by the Authority electronically or at its office located at 1000 N. Cabrillo Highway, Half Moon Bay, California 94019, on or before 2:00 PM, April 15, 2025. Proposals will be examined and considered by the Board of Directors of the Authority at its next meeting. Proposals shall be submitted per the instructions included in the RFP. Each Proposal shall conform and be responsive to this notice and all other documents comprising the RFP. Electronic copies of the RFP may be requested in writing at no cost to the following email: kishen@samcleanswater.org Questions related to the RFP shall be directed to the Authority's engineer for this project: Engineer, Sewer Authority Mid-Coastside, Half Moon Bay, CA 94019; (650) 726-0124; kishen@samcleanswater.org. Deadline to submit questions is close of business (4 PM) on March 24, 2025. Dated this 3rd day of March, 2025 Sewer Authority Mid-Coastside By: __________________________ Kishen Prathivadi, General Manager