INVITATION TO BID: Caltrans #04-2A3324-Hwy 84 in Fremont, Bidding 2/4 @ 2pm. Seeking certified DBE firms for: CAS, TRAFFIC CONTROL SYSTEM, TEMP K RAIL, COLD PLANE, DEMOLITION / BRIDGE REMOVAL, CLEAR & GRUB, LANDSCAPE / HIGHWAY PLANTING, HYDROSEED, EROSION CONTROL, AC DIKE, CIDH PILES, STRUCTURAL CONCRETE, MINOR CONCRETE STRUCTURE, JOINT SEAL, REINFORCING STEEL, ROADSIDE SIGNS, ALTERNATIVE PIPE CULVERT, FENCING, MBGR, METAL RAILING, THERMOPLASTIC TRAFFIC STRIPING & PAVEMENT MARKINGS, SIGNAL & LIGHTING, SWPPP PLANNING, STREET SWEEPING, MATERIAL SUPPLIERS, TRUCKING, DRILL AND BOND DOWEL, CARBON FIBER REINFORCED POLYMER STRIP, CONCRETE (DITCH LINING), CLASS VI ROCK SLOPE PROTECTION, CLASS VIII ROCK SLOPE PROTECTION, CABLE NET DRAPERY SYSTEM, PREPARE AND STAIN CONCRETE, DYNAMIC ACTIVE WARNING SYSTEM & RADAR SPEED FEEDBACK SIGN SYSTEMS Engineer's Estimate: $19,400,000 / DBE Goal: 16% / 400 WD / $10,000 per day LD/Submit quotes by Noon on bid date. GCC is available to discuss breaking out any protion of wrok to encourage minority participation. Mr. Jim Petnic (707/585-1221 or jimp@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: GCC may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. GCC will pay bond premiums up to 1 ½% of contract cost. GCC is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)
Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be downloaded for free through the Department of Transportation via their website at http://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=04-2A3324. Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC's written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC's website (www.ghilotti.com/subcontractors/) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.
Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form 'CG-2010-1185' or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required.
GHILOTTI CONSTRUCTION COMPANY, INC., 246 GHILOTTI AVENUE, SANTA ROSA, CA 95407, PH: (707) 585-1221 * FX: (707) 585-1601 / We are an equal opportunity employer. Show more »