Marketplace
  1. Home
  2. Legal Notices
  3. Legal notices (non-government)
  • Place an Ad
  • Sign In
  • Register

Unfortunately, the listing you're looking for is no longer available.

Similar Listings

 

SEEKING CERTIFIED LBE & DBE CONSULTANTS FOR PROFESSIONAL SERVICES SCOPES Jacobs/PCL, a SF Joint Venture (Jacobs/PCL) will be submitting a proposal to deliver a Progressive Design Build Project for nutrient removal upgrades to the Southeast Water Pollution Control Plant for the San Francisco Public Utilities Commission in San Francisco, CA. Jacobs/PCL invites all interested businesses to submit solicitations of interest, including local, disadvantaged, minority, small, women- owned and disabled-veteran businesses (LBE, DBE, MBE, SBE, WBE, DVBE) capable of supporting this project. Jacobs/PCL is seeking certified LBE and DBE consultants to fulfill the following professional services scopes at this time: Survey (including Land, geotechnical, Hazardous Materials, Environmental and Historical Resource Surveys), Civil Engineering, Architecture, Building Mechanical, Structural Assessment and Engineering, geotechnical Engineering, Cost Estimating, Scheduling, and Public Outreach. Firms and key staff shall demonstrate past or current experience on programs of similar size and complexity in the water and wastewater industry. Certifications accepted: LBE certification from San Francisco Contract Monitoring Division; DBE certification from USEPA, SBA, Caltrans State implemented DBE Certification Program (with U.S. citizenship), Tribal, State, and Local governments, and Independent private organization certifications. Firms must be able to comply with prevailing wage requirements. Should Jacobs/PCL be retained by the SFPUC as their Design-Builder for the project, subsequent outreach efforts related to construction services will be performed at a later date. IF INTERESTED Email a brief statement of qualifications and a copy of your firm's DBE certification(s) to the address below: Simonette White Senior Proposal Manager, jacobs_outreach@jacobs.com Deadline: Monday, October 6, 2025, at 12:00 noon Pacific Time Show more »
Post Date: 09/04 12:00 AM
Refcode: #IPLSFC01002720 

 

NOTICE OF AVAILABILITY OF A PARTIALLY RECIRCULATED ENVIRONMENTAL IMPACT REPORT The California Department of Resources Recycling and Recovery (CalRecycle), as the Lead Agency, has prepared a Partially Recirculated Draft Program Environmental Impact Report (PEIR) pursuant to the California Environmental Quality Act (CEQA) for the Plastic Pollution Prevention and Packaging Producer Responsibility Act (the Act), Senate Bill (SB) 54 (Allen, Chapter 75, Statutes of 2022), Implementing Regulations (Proposed Program). The Proposed Program would implement the requirements of the Act for producers of covered materials to source reduce plastic covered material and meet recyclability and compostability targets; for producers to establish a Producer Responsibility Organization (PRO) for the purpose of developing and implementing an Extended Producer Responsibility program for covered material; reporting and fee requirements for producers; and requirements for local jurisdictions and recycling service providers. It is reasonably foreseeable that meeting the Act's source reduction and recycling rates will require the development of infrastructure to optimize recycling and disposal waste streams, including collection, sorting, and processing facilities. A Draft PEIR was previously released for public comment on November 4, 2024. The Partially Recirculated Draft PEIR reflects changes to the Implementing Regulations and updates information in the environmental analysis to be consistent with the changes. The Partially Recirculated Draft PEIR will be circulated for a forty-five (45) day public review period, beginning on August 26, 2025, and ending on October 10, 2025. An electronic copy of the Notice of Completion and Availability and the Partially Recirculated Draft PEIR is available at: https://ceqanet.lci.ca.gov/Project/2024070487 CalRecycle is requesting that anyone wishing to submit written comments on the Partially Recirculated Draft PEIR limit their comments to the revised portions of the Draft PEIR. CalRecycle is accepting comments on only the revised text contained in the Recirculated Draft PEIR (the text that is either underlined or struck through) during a 45-day review period (CEQA Guidelines, § 15088.5(f)(2).). CalRecycle is not accepting additional input on non-recirculated chapters of the Draft PEIR, or portions thereof, that remain unchanged, and was previously circulated for public review. Please send your written comments to CalRecycle by one of the following delivery methods. In your comments, please include your name and contact information and "SB 54 Implementing Regulations CEQA" at the top of your comment. Electronically: https://calrecycle.commentinput.com?id=JQCVbSREg E-mail: Packaging@CalRecycle.ca.gov Post: Department of Resources Recycling and Recovery (CalRecycle) 13th Floor - Fidan Aghayarova P.O. Box 4025 Sacramento, CA 95812-4025 All comments must be received no later than 5:00 p.m. on October 10, 2025. Show more »
Post Date: 08/21 12:00 AM
Refcode: #IPLSFC00980430 

 

Cellco Partnership and its controlled affiliates doing business as Verizon Wireless (Verizon Wireless) is proposing to collocate antennas at 166-ft on a 166-ft Building at 601 Van Ness Ave, San Francisco, San Francisco, California 94102. Public comments regarding potential effects from this site on historic properties may be submitted within 30 days from the date of this publication to: Project 061893-PR, EBI Consulting, 21 B Street, Burlington, MA 01803, EBIPNReplies@ebiconsulting.com or at (617) 715-1822. Show more »
Post Date: 08/28 12:00 AM
Refcode: #IPLSFC00986750 
- Advertisement -
iPublish® Marketplace powered by iPublish® Media Solutions © Copyright 2023