Unfortunately, the listing you're looking for is no longer available.
Similar Listings
NOTICE OF SALE OF ABANDONED PERSONAL PROPERTY
Notice is hereby given pursuant to Sections 1988 and 1993.07, whichever may be
applicable, of the California Civil Code, that the property listed below, believed to be
abandoned by Mary Daniels aka Mary Hall Daniels, will be sold at a public sale at
October 28, 2025 at 10:00 a.m. at 1202 Haight Street, Hotel Room #12, San Francisco,
California 94117.
Space heater, Fold-up shopping cart, Wheelchair (Drive) #1, Wheelchair (Drive) #2, Hoyer hydraulic patient lift, Medical bed (Drive, adjustable, with rails), Trapeze bar (over-bed, Drive), Adult briefs (multiple unopened packages/cases), Small flat-screen TV(Magnavox, with cords) Large TV (non-working), Stereo system (boom box) #1, Stereo system (boom box) #2, Stereo system (CD/tape player, silver unit), Large cabinet stereo system with cassette deck, Two small radios, Stereo receiver & cassette deck (in wood cabinet), Miscellaneous cords and cables (lot), Records (large lot, approx. 100+), VHS tapes (dozens, bulk lot), furniture (chairs, side table, armchair, floor lamp, household items (pots, pans, dishes, small appliances, bedlinens, books, magazines, miscellaneous items).
Dated this October 16, 2025, and October 23, 2025.
Fried, Williams & Grice Conner LLP
Steven C. Williams
625 Market Street, 4th Floor
San Francisco, CA 94105
Telephone: 415-421-0100 Show more »
The San Luis & Delta-Mendota Water Authority (Water Authority) is notifying interested vendors of an upcoming solicitation under a Request for Qualifications and Proposals from Construction Manager/General Contractor (CM/GC) firms for the Delta-Mendota Canal Subsidence Correction Project – Phase 1, Tasks 1 through 4. This project will span multiple counties in California's Central Valley. The Phase 1 work includes an approximate 2-foot raise to correct deficient portions of the canal embankment, raising the top of the concrete canal lining to restore design capacity, and modifying associated embankment structures such as turnouts, drain inlets, and shoulder drains to accommodate the embankment and concrete lining raises. The project is intended to restore canal capacity, address the impact of subsidence on the canal's capacity, and ensure the long-term reliability of Central Valley Project water deliveries. This project is supported by a combination of local, state and federal funding.
The Water Authority anticipates issuing the Request for Proposals in late October 2025, with contract award and preconstruction services in early 2026 and construction commencing later that year. Interested firms must participate in the mandatory pre-proposal conference and project walk-through tentatively scheduled for early-mid November 2025. Interested vendors may obtain a Preliminary Scope and request to be added to the vendor list by contacting the Water Authority's Contract Specialist, Travis Roberts, at travis.roberts@sldmwa.org. Show more »
Cellco Partnership and its controlled affiliates doing business as Verizon Wireless (Verizon Wireless) is proposing to build within a 27.0-ft building multiple In-building antenna system telecommunications facilities located at 380 Laguna Honda Boulevard, San Francisco, California, 94116 . Public comments regarding potential effects from this site on historic properties may be submitted within 30 days from the date of this publication to: Project 250050417PR, EBI Consulting, 21 B Street, Burlington, MA 01803, EBIPNReplies@ebiconsulting.com or at (617) 715-1822. Show more »